INTEGRATED OCEAN DRILLING PROGRAM - ESO EXPEDITION 302
ACRONYMS USED FOR WIRELINE SCHLUMBERGER TOOLS
BHC | Borehole Compensated Tool |
FMS | Formation MicroScanner |
GPIT | General Purpose Inclinometry Tool |
NGT | Natural Gamma Ray Spectrometry Tool |
SGT | Scintillation Gamma Ray Tool |
 ACRONYMS AND UNITS USED FOR WIRELINE SCHLUMBERGER LOGS
AX | GPIT Acceleration X Axis (ft/s2) |
AY | GPIT Acceleration Y Axis (ft/s2) |
AZ | GPIT Acceleration Z Axis (ft/s2) |
AZIM | GPIT Constant Azimuth for Deviation Correction (°) |
C1 | FMS Caliper 1 (in) |
C2 | FMS Caliper 2 (in) |
CGR | NGT Computed (Th+K) Gamma Ray (API units) |
CS | Cable Speed (m/hr) |
DEVI | GPIT Hole Deviation (°) |
DF | Drilling Force (lbf) |
DT | BHC Short Spacing Delta-Time (10'-8' spacing; μs/ft) |
DTL | BHC Long Spacing Delta-Time (12'-10' spacing; μs/ft) |
ECGR | SGT Environmentally Corrected Gamma Ray (API units) |
EHGR | SGT Environmentally Corrected High Resolution Gamma Ray (API units) |
ETIM | Elapsed Time (sec) |
FINC | GPIT Magnetic Field Inclination (°) |
FNOR | GPIT Magnetic Field Total Moment (oersted) |
FX | GPIT Magnetic Field on X Axis (oersted) |
FY | GPIT Magnetic Field on Y Axis (oersted) |
FZ | GPIT Magnetic Field on Z Axis (oersted) |
HAZI | GPIT Hole Azimuth (°) |
HSGR | Standard (total) Gamma Ray (API units) |
ITT | Integrated Transit Time (s) |
P1AZ | GPIT Pad 1 Azimuth (°) |
POTA | NGT Potassium (%) |
RB | GPIT Pad 1 Relative Bearing (°) |
SGR | NGT Total Gamma Ray (API units) |
TENS | Tension (lb) |
THOR | NGT Thorium (ppm) |
TT1 | BHC Transit Time (10' spacing; μs) |
TT2 | BHC Transit Time (8' spacing; μs) |
TT3 | BHC Transit Time (12' spacing; μs) |
TT4 | BHC Transit Time (10' spacing; μs) |
URAN | NGT Uranium (ppm) |
VP | BHC Compressional Velocity, computed from DT (km/s) |
W1NG | NGT Window 1 counts (cps) |
W2NG | NGT Window 2 counts (cps) |
W3NG | NGT Window 3 counts (cps) |
W4NG | NGT Window 4 counts (cps) |
W5NG | NGT Window 5 counts (cps) |