Field Log Plots file index
Mallik - Hole 2L38 (2007)

The pdf plots listed below were generated by the field engineer at the time of acquisition, before any processing or quality control.

List of the file names: Field Log Plots file dictionary
List of Mallik acronyms

Field Log Plots files:
Array Induction Imager Tool - Run 1  (1.7 MB)
Array Induction Imager Tool - Pre-Drilling Run  (1.2 MB)
Accelerator Porosity Sonde - Highly Integrated Gamma Ray Neutron Sonde - Three-Detector Lithology Density Tool - Run 2  (1.5 MB)
Combinable Magnetic Resonance Tool - Run 2  (2.2 MB)
Combinable Magnetic Resonance Tool - Pre-Drilling Run  (2.0 MB)
Run 1 - Cement Volume Log  (667 KB)
Cement Volume Log - Pre-Drilling Run  (2.0 MB)
Elemental Capture Spectroscopy Sonde - Run 2  (1.6 MB)
Environmental Measurement Sonde - Run 1  (2.0 MB)
Environmental Measurement Sonde - Pre-Drilling Run  (3.8 MB)
Fullbore Formation MicroImager - Run 3  (21 MB)
Hostile Environment Gamma Ray Sonde - Run 2  (754 KB)
High Resolution Laterolog Array - Run 1  (1.7 MB)
Magnetic Resonance Scanner - Run 5  (527 KB)
Platform Express - Run 4  (321 KB)
Sonic Scanner - Run 3  (988 KB)
Three-Detector Lithology Density Tool - Highly Integrated Gamma Ray Neutron Sonde - Pre-Drilling Run  (853 KB)


Follow the link to any individual file to access it directly, or return to the hole data summary and select the appropriate link to download all the files as a compressed archive (full archive size = 38 MB).