Wireline Standard Data

 

ODP logging contractor: LDEO-BRG

Hole: 1243A

Leg: 203

Location:Equatorial Pacific Ion (equatorial NE Pacific)

Latitude:5° 18.0541' N

Longitude:110° 4.5798' W

Logging date:June 25, 2002

Bottom felt:3882.4 mbrf

Total penetration:224 mbsf

Total core recovered:none

 

Logging Runs

From Orcutt, J.A., Schultz, A., Davies, T.A., et al., 2003. Proc. ODP, Init. Repts., 203: "The CBL was deployed in Hole 1243A to measure cement bond quality. The tool was rigged up and lowered at 0115 hr. The tool reached the BOH at 0330 hr and was pulled up at a speed of 3000 ft/hr. It passed the EOP at a logging depth of 3968.5 mbrf (86.1 mbsf; determined by an increase in gamma ray activity and an increase of transit time from pipe to casing). A second run was performed at the same speed after the tool had been lowered to the BOH. After the second run was completed and the tool was lowered to the BOH, a third run was performed uphole at a speed of 2000 ft/hr and stopped at the EOP. All three runs confirmed the BOH at 4088 mbrf (205.6 mbsf). The tool was then pulled up to the rig floor and rigged down by 0600 hr, at which time logging was completed. The wireline was rigged down at 0800 hr 25 June."

 

Cristina Broglia
Phone: 845-365-8343
Fax: 845-365-3182
E-mail: Cristina Broglia