FMS images showing a 19-m interval immediately below the 10.75-in casing shoe that was inserted inside Hole 1188F. The cement extends for 3 m below the casing shoe. Below this depth, high fracture density and brecciated zones are displayed as well as an enlarged section of the borehole. The leftmost four strips were statically normalized whereas the 4 panels on the right represent a dynamic normalization.